Directory profiles · Battery Business Directory
Organizations mentioned or cited on this 2023 report page. A historical mention does not establish current products, availability or endorsement.
Sources and links on page 43 (4)
Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.
- https://www.charged-the-book.com/na-ev-supply-chain-map
- https://source.benchmarkminerals.com/downloads/special-issues
- https://felt.com/map/Global-Battery-Factory-Database-Exponential-Industry-Ratel-Consulting-yJVihZhSToCiNiDEaqD0vB?loc=30.561,109.341,5.63z
- https://battery-news.de/wp-content/uploads/2023/12/231215_USA_BP-1030x579.png
Text on page 43
Gigafactory Tracker - 1,564 GWh of Capacity USA 1 ABF, USA, 15 GWh* 2 Amprius Tech, USA, 10 GWh* 3 Electrovaya Tech, USA* 4 Envision AESC, USA, 3 GWh 5 Envision AESC, USA, 30 GWh* 6 Envision AESC/Mercedes-Benz, USA, 40 GWh* 7 Ford/CATL, USA, 20 GWh* 8 FREYR, USA, 34 GWh* 9 Gotion, USA* 10 IM3NY/MAGNIS, USA, 38 GWh* 11 KORE Power, USA, 12 GWh* 12 LGES, USA, 27 GWh* 13 LGES, USA, 25 GWh* 14 Ultium Cells, USA, 50 GWh* 15 Ultium Cells, USA, 70 GWh 16 LGES/Honda, USA, 40 GWh* 17 Panasonic, USA, 39 GWh* 18 Panasonic/Tesla, USA, 100 GWh* 19 Samsung SDI/GM, USA, 30 GWh* 20 Samsung SDI/Stellantis, USA, 67 GWh*
21 SK, USA, 31.3 GWh 22 SK/Ford, USA, 86 GWh* 23 SK/Hyundai, USA, 35 GWh* 24 Tesla, USA, 10 GWh 25 Toyota, USA, 30 GWh* 26 LGES/Hyundai, USA, 30 GWh* 27 Ultium Cells, USA, 41 GWh 28 Electrovaya, USA* 29 Forge Battery, USA* 1-3 GWh 30 SAFT, USA, 2 GWh* 31 Tesla, USA, 100 GWh 32 Our Next Energy, USA, 20 GWh* 33 Gotion, USA, 40 GWh*
Canada 34 LGES/Stellantis, CA, 45 GWh* 35 PowerCo, St. Thomas, CA, 90 GWh* 36 Lion Electric, Quebec, CA, 5 GWh 37 STORMVOLT, Quebec, CA, 10 GWh* 38 Northvolt, Montreal, CA, 60 GWh*
Source: Charged: NA EV Battery Supply Chain, Benchmark Minerals, Felt: Global Battery Factory Database, Battery-News.de
*Non-operational, slated for future date
Extracted from the PDF; charts and images may read imperfectly.
Page 43 · 4/29