Applications: Battery Energy Storage Systems (BESS)
Cover and introductionp.1
IndustryIndustry Summaryp.5
IndustryNotable Eventsp.7
IndustryIndustry Value Chainp.21
IndustryFinancep.40
IndustryCostsp.57
IndustryCell & Pack Manufacturingp.69
IndustryApplicationsp.104
IndustryApplications: Electric Vehicles (EV)p.106
IndustryApplications: Battery Energy Storage Systems (BESS)p.137
Text on page 150
ESS Technology Bankability - Degradation, Cycle-life And Product Warranties / Guarantees
Workmanship Warranties: Most BESS Manufacturers, together with EPC contractors, offer a ‘workmanship warranty’ that covers a period following the system’s reaching Commercial Operations Date (COD). Most commonly this warranty is valid for 1-3 years, covering initial defects and component failures (short-term).
Performance Guarantees: Beyond COD, manufacturers typically offer performance guarantees for their systems under a separate Long Term Service Agreement (LTSA). These guarantees allow for a certain level of guaranteed degradation, verified by a capacity test, conducted annually. The most common terms for an LTSA are warranties:
7,200 cycles over 20 years (equivalent to 1 cycle per day), although some manufacturers are offering warranties up to 10,000 cycles over 25 years
Typical degradation from 100% at COD to approximately 70% in year-20
Typical round-trip efficiencies
Guaranteed Availability of 97% or more, outside of the system’s scheduled maintenance hours
Corrective Maintenance: Most LTSAs do not cover corrective maintenance, which is the result of an unexpected event in the system’s operations, although some contracts offer a higher-priced ‘Extended Warranty’ which does include a larger payment to account for corrective maintenance work.
Insurance Requirements: Insurance is typical at several tiers of the project: manufacturers insure their expected degradation levels, EPC contractors hold insurance policies to cover for unforeseeable issues in construction, and projects transition to operational project insurance once the project has reached COD.
Bankability: All of the above policies, warranties, and guarantees have become more standardized in the industry, resulting in greater confidence for finance of utility-scale energy storage projects; collectively this is a sign of the industry maturing and becoming more bankable.
Source: PowerSwitch, Norton Rose Fulbright, ACCURE, DNV, Energy Storage News
Extracted from the PDF; charts and images may read imperfectly.
IndustryApplications: Otherp.174
IndustrySafetyp.187
IndustryLegalp.195
IndustryChemistryp.198
IndustryChemistry: Cathodep.203
IndustryChemistry: Anodep.233
IndustryChemistry: Electrolyte & Separatorp.250
IndustryChemistry: Solid Statep.259
IndustryChemistry: Lithium-Sulphurp.269
IndustryChemistry: Non-Lithium Chemistriesp.277
IndustrySupply Chain & Raw Materialsp.300
IndustryRecycling & Reusep.317
IndustrySoftwarep.331
AcademiaOverviewp.354
AcademiaMacro Research Trendsp.356
AcademiaSeminal Literaturep.360
AcademiaLithium-Ion: Cathodep.370
AcademiaLithium-Ion: Anodep.377
AcademiaLithium-Ion: Electrolytep.383
AcademiaSodium Ionp.390
AcademiaNew & Alternative Chemistriesp.397
AcademiaFast & Extreme Fast Chargingp.404
AcademiaFundamentalsp.408
AcademiaLife Prediction and Modellingp.413
AcademiaTesting & Analysis Techniquesp.420
AcademiaRecyclingp.426
AcademiaBattery Safetyp.429
TalentOverviewp.431
TalentBattery Talent Censusp.435
TalentH1B Analysisp.466
TalentEducational Resourcesp.473
PolicyOverviewp.483
PolicyNorth Americap.489
PolicyEuropep.497
PolicyAsiap.505
PolicySouth Americap.508
PredictionsThe Next 12 Monthsp.510
Closing pagesp.512
Applications: Battery Energy Storage Systems (BESS)
Page 150 of 518Directory profiles (3)
Organizations mentioned or cited on this 2024 report page. A historical mention does not establish current products, availability or endorsement.
Sources and links on page 150 (4)
Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.
- https://www.nortonrosefulbright.com/en/knowledge/publications/e295e9d2/the-bess-is-yet-to-come
- https://www.accure.net/battery-knowledge/third-party-battery-warranty-management-benefits
- https://www.dnv.com/article/energy-storage-capacity-warranties-beyond-the-fine-print-200339/
- https://www.energy-storage.news/complexity-and-risk-of-bess-warranties-prohibitive-for-some-asset-owners/
More in Industry (21)
Authors for Applications (8)
Text on page 150
ESS Technology Bankability - Degradation, Cycle-life And Product Warranties / Guarantees
Workmanship Warranties: Most BESS Manufacturers, together with EPC contractors, offer a ‘workmanship warranty’ that covers a period following the system’s reaching Commercial Operations Date (COD). Most commonly this warranty is valid for 1-3 years, covering initial defects and component failures (short-term).
Performance Guarantees: Beyond COD, manufacturers typically offer performance guarantees for their systems under a separate Long Term Service Agreement (LTSA). These guarantees allow for a certain level of guaranteed degradation, verified by a capacity test, conducted annually. The most common terms for an LTSA are warranties:
7,200 cycles over 20 years (equivalent to 1 cycle per day), although some manufacturers are offering warranties up to 10,000 cycles over 25 years
Typical degradation from 100% at COD to approximately 70% in year-20
Typical round-trip efficiencies
Guaranteed Availability of 97% or more, outside of the system’s scheduled maintenance hours
Corrective Maintenance: Most LTSAs do not cover corrective maintenance, which is the result of an unexpected event in the system’s operations, although some contracts offer a higher-priced ‘Extended Warranty’ which does include a larger payment to account for corrective maintenance work.
Insurance Requirements: Insurance is typical at several tiers of the project: manufacturers insure their expected degradation levels, EPC contractors hold insurance policies to cover for unforeseeable issues in construction, and projects transition to operational project insurance once the project has reached COD.
Bankability: All of the above policies, warranties, and guarantees have become more standardized in the industry, resulting in greater confidence for finance of utility-scale energy storage projects; collectively this is a sign of the industry maturing and becoming more bankable.
Source: PowerSwitch, Norton Rose Fulbright, ACCURE, DNV, Energy Storage News
Extracted from the PDF; charts and images may read imperfectly.