Sources and links on page 84
Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.
No web links were embedded in this page of the original PDF. Printed source text may still appear on the page.
Text on page 84
Manufacturing Process Groups - Leading Edge 20 GWh Pouch Line
Degas
Fill Soak
Age
Calendar & Slit
Test
Formation
Ship
Age
Package
Stack / Wind Calendar & Slit
Mix Coat/Dry Coat/Dry Mix
Many models and manufacturing metrics currently in use are based on early ‘GWh-scale’ factories using outdated estimates Current generation (leading edge) facility metrics are now available based on LGES facility
Source: City of Holland, Michigan, USA
Extracted from the PDF; charts and images may read imperfectly.
More in Industry (21)
Overviewp.5Notable Eventsp.7Industry Value Chainp.21Financep.40Costsp.57Applicationsp.104Applications: Electric Vehicles (EV)p.106Applications: Battery Energy Storage Systems (BESS)p.137Applications: Otherp.174Safetyp.187Legalp.195Chemistryp.198Chemistry: Cathodep.203Chemistry: Anodep.233Chemistry: Electrolyte & Separatorp.250Chemistry: Solid Statep.259Chemistry: Lithium-Sulphurp.269Chemistry: Non-Lithium Chemistriesp.277Supply Chain & Raw Materialsp.300Recycling & Reusep.317Softwarep.331
Page 84 · 16/35