Text on page 100
List of Open-Access / Quasi-Foundry Pilot Lines in US Organization
Location / Size
Battery Focus
Fabrication & Build
Testing & Safety
Teardown & Analytics
RIT – Battery Development Center (BDC)
Rochester, NY
Open-access pilot cell manufacturing, testing, and safety validation
Electrodes: slurry mixing + roll-to-roll coating
Cycling: 650+ channels, 0–1000 V, up to 240 kW
Teardown: diagnostic analysis via testing center
Safety: abuse & thermal testing up to ~500 Ah
Analytics: partial in-house
Industry-accessible academic pilot line bridging lab → commercial formats
Electrodes: reel-to-reel pilot coating
Cycling: 500+ channels, 5 V, 30 μA–50 A
Teardown: not marketed
Cells: 18650, 21700, pouch up to 15 Ah
Safety: abuse + ARC testing
Analytics: XRD, DSC/TGA-MS, rheology, EIS
Open-access academic dry-room cell build & test capability
Electrodes: slurry mixing, coating & calendaring
Cycling: 400+ channels
Teardown: not specified Analytics: campus-shared facilities
Rapid prototyping & scale-up for commercialization
Cells: pouch (~80×100 mm, ~10–20 Ah) & 18650 cylindrical
Established ~2014–2015
Cells: pouch (34×50 mm → 250×250 mm), cylindrical
~15–30 staff University of Michigan – Battery Lab
Ann Arbor, MI Established 2015 ~20–30 staff
Binghamton University – NECCES Dry Room
Binghamton, NY Established ~2015
Safety: not specified Cells: pouch assembly line
~15–30 staff
BEACONS (UT Dallas) Richardson / Dallas, TX (UT Dallas) ~15,000 sq ft facility
Dry rooms: 3,500 sf ≤1% RH + 400 sf ≤0.25% RH (same source)
Cycling: formation & aging available (same source)Safety: abuse testing via partners (same source)
Teardown: not specified Analytics: materials characterization via UT Dallas facilities
Extracted from the PDF; charts and images may read imperfectly.
IndustryApplicationsp.127
IndustryApplications: EVp.130
IndustryApplications: Stationary Energy Storagep.182
IndustryApplications: Data Centersp.233
IndustryApplications: Aviation, Drones, Spacep.243
IndustryApplications: Roboticsp.256
IndustryApplications: Otherp.264
IndustrySafetyp.266
IndustryCell Design and Materialsp.282
IndustryCell Design and Materials: Li-Ionp.297
IndustryCell Design and Materials: Lithium Sulfurp.360
IndustryCell Design and Materials: Solid-Statep.367
IndustryCell Design and Materials: Sodium-Ionp.387
IndustryCell Design and Materials: Alternative Chemistriesp.397
IndustrySupply Chain: Upstream and Midstreamp.419
IndustrySupply Chain: Recycling & Secondary Marketsp.439
IndustrySoftware / AIp.455
ChinaExecutive Summaryp.486
ChinaHistoryp.489
ChinaPolicy Landscapep.498
ChinaTalent & Ecosystem Maturityp.505
ChinaCapitalp.510
ChinaSupply Chainp.518
ChinaTechnology Innovationp.536
AcademiaSection Summaryp.552
AcademiaResearch Trendsp.555
AcademiaSeminal Literaturep.560
AcademiaFundamentalsp.571
AcademiaLithium-Ionp.575
AcademiaSolid State Batteriesp.594
AcademiaBattery Degradation and Performancep.605
AcademiaNew / Alternative Chemistriesp.618
AcademiaFast Charging & Extreme Fast Chargingp.630
AcademiaArtificial Intelligence and Machine Learningp.632
AcademiaBattery Management System (BMS)p.638
AcademiaRecyclingp.642
AcademiaBattery Safetyp.649
TalentExecutive Summaryp.653
TalentWorkforce Landscapep.657
TalentEmerging Trendsp.662
TalentPolicy & Immigrationp.668
TalentCompensation & Benefitsp.675
TalentIndustry Sentimentp.680
TalentSkills & Training Gapsp.687
TalentEducational Developmentp.692
TalentWorkforce Researchp.698
TalentAccess & Advancementp.702
PolicyNorth Americap.706
PolicyEuropep.724
PolicyAsiap.731
PolicyLegalp.737
CommunityConferencesp.755
PredictionsThe Next 12 Monthsp.760
Closing pagesp.762
Cell & Pack Manufacturing
Page 100 of 768Directory profiles (2)
Organizations mentioned or cited on this 2025 report page. A historical mention does not establish current products, availability or endorsement.
Sources and links on page 100 (7)
Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.
- https://www.rit.edu/batterydevelopment
- https://www.rit.edu/batterydevelopment/about-bdc-testing
- https://umbatterylab.engin.umich.edu/
- https://news.engin.umich.edu/2025/08/u-michigan-battery-lab-2-0-expansion-open-for-innovation
- https://www.binghamton.edu/centers/necces
- https://www.binghamton.edu/centers/necces/dry-room
- https://beaconsusa.org/prototype-with-beacons
More in Industry (22)
Authors for Cell & Pack Manufacturing (3)
Text on page 100
List of Open-Access / Quasi-Foundry Pilot Lines in US Organization
Location / Size
Battery Focus
Fabrication & Build
Testing & Safety
Teardown & Analytics
RIT – Battery Development Center (BDC)
Rochester, NY
Open-access pilot cell manufacturing, testing, and safety validation
Electrodes: slurry mixing + roll-to-roll coating
Cycling: 650+ channels, 0–1000 V, up to 240 kW
Teardown: diagnostic analysis via testing center
Safety: abuse & thermal testing up to ~500 Ah
Analytics: partial in-house
Industry-accessible academic pilot line bridging lab → commercial formats
Electrodes: reel-to-reel pilot coating
Cycling: 500+ channels, 5 V, 30 μA–50 A
Teardown: not marketed
Cells: 18650, 21700, pouch up to 15 Ah
Safety: abuse + ARC testing
Analytics: XRD, DSC/TGA-MS, rheology, EIS
Open-access academic dry-room cell build & test capability
Electrodes: slurry mixing, coating & calendaring
Cycling: 400+ channels
Teardown: not specified Analytics: campus-shared facilities
Rapid prototyping & scale-up for commercialization
Cells: pouch (~80×100 mm, ~10–20 Ah) & 18650 cylindrical
Established ~2014–2015
Cells: pouch (34×50 mm → 250×250 mm), cylindrical
~15–30 staff University of Michigan – Battery Lab
Ann Arbor, MI Established 2015 ~20–30 staff
Binghamton University – NECCES Dry Room
Binghamton, NY Established ~2015
Safety: not specified Cells: pouch assembly line
~15–30 staff
BEACONS (UT Dallas) Richardson / Dallas, TX (UT Dallas) ~15,000 sq ft facility
Dry rooms: 3,500 sf ≤1% RH + 400 sf ≤0.25% RH (same source)
Cycling: formation & aging available (same source)Safety: abuse testing via partners (same source)
Teardown: not specified Analytics: materials characterization via UT Dallas facilities