Text on page 103
Manufacturing Process Map - Overview Mixing
Cathode and anode slurries are made
Coating & Drying Slurries are coated onto the current collector
Cell Capacity
Cylindrical or Wound Prismatic Winding - components are wound into a jelly roll Electrolyte is injected
Prismatic: 1-200+ Ah Pouch: 1-100+ Ah 2170: 3-6 Ah 4680: 15-25 Ah
Physical Inspection CT and/or X-Ray
Calendering Electrodes are densified
Formation
Batteries are charged and discharged
CAPEX* $55-150 million/GWh
Aging
Electrochemical performance is monitored
SCRAP (RAMP UP)
Degassing
Gas in the battery is removed (pouch & prismatic only)
Slitting & Notching
Electrical Inspection
Electrodes are cut into simulated segments for stacked cells or into pancake rolls for wound cells
OCV, ACIR, and capacity (often partial-cap tests)
Stacked Pouch or Prismatic Components are laminated & stacked Electrolyte is injected
Note: Graphics courtesy of LG Energy Solution. Reproduced with permission.
Scrap remains high in ramp-up, mainly due to electrode quality. See QC/analytics slides for example detection points & solutions. *CAPEX reflects tooling only. The higher end of the range is driven by the fact that most equipment is sourced from Asia and is subject to significant import tariffs.