VFBATTERY REPORT
Industry

Applications: Data Centers

Page 236 of 768
Battery Report 2025, page 236: Applications: Data Centers

Directory profiles · Battery Business Directory

Organizations mentioned or cited on this 2025 report page. A historical mention does not establish current products, availability or endorsement.

Sources and links on page 236 (1)

Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.

  1. https://open.substack.com/pub/katherinehe142365/p/ai-hit-a-wall-in-2025-that-wall-is?utm_campaign=post&utm_medium=web
Text on page 236

The Energy Ecosystem Underpinning Data Center Development, with Batteries at the Core

Major BESS Deals of 2024-25 Aligned Data Centers announced a landmark 31 MW / 62 MWh BESS deal in October 2025 with Calibrant Energy for a Pacific Northwest campus PJM awarded interconnection to 23 BESS projects totaling 2.2 GW in December 2025, many co-located or hybrid with data center hotspots in the mid-Atlantic to ease grid strain from AI loads

Source: AI Hit a Wall in 2025. That Wall Is Power, Substack

Extracted from the PDF; charts and images may read imperfectly.

More in Industry (22)
Authors for Applications (10)

Page 236 · 4/10