Applications: Data Centers
Page 236 of 768Directory profiles · Battery Business Directory
Organizations mentioned or cited on this 2025 report page. A historical mention does not establish current products, availability or endorsement.
Sources and links on page 236 (1)
Links embedded in the original report PDF, including citations and other references. These destinations have not been independently reviewed. Links open in a new tab.
Text on page 236
The Energy Ecosystem Underpinning Data Center Development, with Batteries at the Core
Major BESS Deals of 2024-25 Aligned Data Centers announced a landmark 31 MW / 62 MWh BESS deal in October 2025 with Calibrant Energy for a Pacific Northwest campus PJM awarded interconnection to 23 BESS projects totaling 2.2 GW in December 2025, many co-located or hybrid with data center hotspots in the mid-Atlantic to ease grid strain from AI loads
Source: AI Hit a Wall in 2025. That Wall Is Power, Substack
Extracted from the PDF; charts and images may read imperfectly.
More in Industry (22)
Page 236 · 4/10